12/23/04
We lost the shingles on the
south side of the roof in a freak
wind and rain storm which
damaged much of what had
been completed in Apt 1.  We
are currently replacing the
existing roof with a new metallic
roof in Antique Bronze.
PLACIDMOOSE.COM
About Us
Lake Placid is the place!!!
We are a family of four that fell in love with the Village
of Lake Placid and rugged beauty of the Adirondacks.  
We had been looking for a house in snow country and
when we visited the village in 2002 we all knew LP
was the place for us.  We closed on the house in May
of that year.  We then began a complete
refurbishment of the house to bring it up to our
standards.   We believe that if you provide a current,
meticulously clean home then the people it will attract
will be the same.
Our Goals
Our goal is to provide a family setting that is a
home away from home.   An Adirondack  home
away from home located in the village where you
can walk to  most functions, that is clean, nicely
furnished, spacious, fun and great place to go to
relax and enjoy the mountains.
We are constantly upgrading...
We use the PLACIDMOOSE as our weekend
mountain house and are there frequently.   We love
refurbishing homes and will most likely always being
doing "something" around the property.   We look
forward to meeting you!
5/31/02
12/15/02
1/20/04
Refurbishment of Apartment 2
was completed.   We:
completely reworked the floor
plan to accommodate a new
larger bath with new fixtures
,replaced the kitchen
appliances, refurbished the
kitchen and installed new
floors, replaced the stairs,
painted and installed new
carpeting.
We completed the
refurbishment of Apartment 1.
Apt. 1 had been trashed by the
previous tenant under the
previous owner.  We cleaned
and cleaned and also
reworked the floor plan to
accommodate the larger bath
with new fixtures, replaced the
kitchen appliances,
refurbished the kitchen,
installed new floors, replaced
the stairs, painted and
installed carpeting and
laminate.
We closed on the house
and began renovation
Timeline
12/31/05
We completed installing the
metal roof in a break in the
winter weather.   We are
preparing for the installation of
the new porch in summer of
2006.  Apartment 1 has been
completely restored from the
damage sustained in the storm.
9/15/06
We are completing the
refurbishment of the bathroom
in Apartment 3.  All new fixtures
and a substantial amount of
space added to a tiny bathroom.  
 A new tile floor and bath
surround and fixtures
substantially improve the space.
  In addition the town is
realigning the street giving us
some much needed privacy
from the road.   4 new serbian
spruce trees are to be installed
this fall in the front of the  house!
November 2008 - Excavated above the french drains and
replaced the sand with crushed stone and reinforced the
old stone foundation with 8 yards of concrete.
January 2009 to January 2010 - Began completely
renovating apartment 3.   Reworked apartment internals
so that the drop ceiling can be replaced with a sheet
rocked ceiling, new insulation for heat retention and
sound proofing.  Replaced  the old floor with a new sub
floor and ceramic tiles.  Installed new light fixtures.  
Removed a boulder that stuck up through the floor
limiting closet space.
Spring of 2011 we removed the bathroom in Apartment 1
and refurbished it with tile and stone walls
and shower,
new tile floors, a new frame less shower and new bath
vanity.   I custom made the bath vanity, my first face frame
cabinet complete with a Euro Space saving sink and
black concrete counter top (my first) .
Summer 2011 - began reinforcing the north basement
wall with 2.5 yards of concrete for the foundation,
complete with rebar and a new block wall to support the
house where the old foundation was weakened by a
century of frost heave.